Major Results
Home
PR Center
Major Results
- 2011
-
- 06Ansan Daejung E&C Replacement Works (56 % Reduction) and Delivery
- 11Established Eco-Steamer Co.Ltd Company
- 11Export to Japan (approximately 1,000 units per year as of 2017 after the first shipment)
- 2012
-
- 03Field Test for the Buyeo Plant of the Korea Mint Corporation
- 2013
-
- 04Replace steam trap for entire line of the Ansan factory in Seoul
- 06Replacing the steam trap for the entire line of the KMA Ansan Plant
- 08Registration of LG Chemical partners, product registration
- 11Replacing the Wash and Dry line steam trap
- 12POSCO CAmtech Partner Company and Product Registration
- 2014
-
- 01Delivery of POSCO Kemtech
- 02Hanwha Energy Installation Complete
- 03LG Chem Naju Plant Delivery
- 05LG Chem Naju Plant 2 Delivery
- 06POSCO CAMPTECH SECOND SECOND
- 07Sample test of Hanwha Co.Ltd Yeosu plant 21 Bar High Pressure Line
- 08BASF Yeosu Factory CCD Line Test Completed
- 08Install samples from Philbest factory in Philippines (63.3 % less)
- 09BASF Yeosu CCD Line Setup
- 09Delivery of the high-pressure line of Hanwha Yeosu Plant
- 12BASF Partner Company, Korea Register Products
- 12Hanwha Group Partner Company, Product Registration
- 2015
-
- 01China BASF-Ba Ba Shanghai Factory Installation (BASF-Bach test completed)
- 01Installation of Hyundai Oilbank Daesan Plant (1st test completed)
- 02Samyang Group Incheon Plant Report (Test 14.12.24 Complete)
- 03Installation of Hyundai Oilbank Daesan Plant (second test completed)
- 03Hyosung Group Site Test and Installation of Gumi Plant
- 06POSCO CAMPTECH COMPRESSION CAPACITY INSTALLATION (approx. 20 % reduction - KRW 50 million / 1 unit, year)
- 08SKC Ulsan Factory Delivery
- 09Hyundai Oilbank Partner Company and Product Registration Complete
- 09Delivery of Hyundai Oilbank
- 09BASF Yeosu Factory CCD Line Delivery Installation
- 10Second delivery of BASF Yeosu Plant CCD Line
- 10POSCO CAMPTECH COMPRESSION SUPPLEMENTARY CAPACITY
- 10Test and replacement value of Daegu Environmental Facility Corporation Bible Industrial Complex
- 12Ssangyong C&B Technical Presentation
- 12Supply four composite thermal power plants at POSCO Gwangyang Plant (super high pressure - 110 bar)
- 2016
-
- 01Replace the steam trap of Ssangyong C&B Air Heater No. 3
- 04Replacing the Steam Trap of Ssangyong C&B Sludge Dryer Dryer
- 04POSCO CAmtech High-Pressure Capacity Delivery Third Delivery
- 05Replace the entire steam trap of Ssangyong C&B sludge dryer
- 05Sample test replacement work for Kyongbuk University Hospital
- 06Delivering a steam trap for Hyundai Oilbank's super high capacity and one site manifest folder
- 11The International Conference of the FM Society of Korea
- 2017
-
- 01Sample test and installation of Samsung Electronics Suwon Park
- 04POSCO CAMPTECH CONSTRUCTION Fourth Delivery
- 07Delivery of replacement for the dominant storage No. 6 dryer
- 11Register Samsung Electronics partner company and product
- 11Replacing steam traps for desiccant air conditioners, etc. in Suwon, Samsung Electronics
- 2018
-
- 01Samsung SDI holds technical presentation
- 03Confirm Eco-Stimmer brand steamers
- 04Sample test for Samsung Electronics suwon Suwon business establishment and sample installation completed